objectivity of facility layout
学び始める
cost - low; quality - high; flexibility - highly flexible; ergonomics - best efficiency; lead time - not to lead the customers too much
Six layout strategies
学び始める
product oriented; process oriented; fixed position; office; retail/service;
office layout
学び始める
grouping of workers, their equipment and spaces to provide movement of information and safety; typically in state of flux due to frequent technological changes; Relationship Chart - which function we want to have close to each other
cross-docking
学び始める
materials are moved directly from receiving to shipping and are not placed in storage in the warehouse
material handling costs
学び始める
ALL costs associated with the transaction - transport, storage, finding and moving materials outgoing transport, supervision, insurance, minimise damage and spoilage
fixed position layout
学び始める
product remains in one place, workers and equipment come to site; complicating factors - limited space at site, different materials required at different stages of the project, volume of materials needed is dynamic
product oriented layout
学び始める
continuous processes and discrete processes; design minimises line imbalance; requirements: volume is adequate for high equipment utilisation, product demand is stable enough, standardised product
characteristics of product oriented layout
学び始める
around-the-clock operations, fixed output rare, machines dictate operations
strong and weak points of continuous processes
学び始める
strong: high productivity and low skilled direct labor; weak: extremely inflexible, difficult maintenance management, very complex start-up, higher fixed cost
discrete processes and strong and weak points
学び始める
fabrication line and assembly line; strong points: low-cost for standardised mass products, unskilled labor, low investments, easy to manage, high speed; weak: balance losses, low flexibility, low quality of work
Assembly Line Balancing
学び始める
all manual labor divided in standard moves, to which standards time are assigned, from rough to details division of all activities needed to realise the product, detailed layout of each workplace, continuous improvements
paced assembly line disadvantages
学び始める
high volume required bus of the large investment, work stoppage of any point can tie up the whole operation, process flexibility can be a challenge
Process-oriented Layout
学び始める
design places departments with large flows of material or people close together, department areas having similar processes located in close proximity, used with process-focused processes, job shops
Characteristics of process-oriented layout
学び始める
large variety of inputs and outputs, much and varied transport, long and varied lead times
Strong and weak points of process-oriented layout
学び始める
strong: ability to make everything, from single piece to sizeable lots, reasonable standard equipment, high productivity workers and decoupled operations; weak: higher costs than mass, narrowly specialised operators, high WIP, costly materials management